execution HEALTH, SAFETY, AND ENVIRONMENTAL PRACTICE
TABLE OF CONTENTS
PURPOSE......
SCOPE..........
APPLICATION.......
DEFINITIONS...........
1.0 CONSTRUCTION AND PRE-COMMISSIONING........
1.1 Management Structure.....
1.2 Employee Involvement.....
1.3 Employee Selection, Competency, and Training.....
1.4 Contractor Selection and Alignment.............
1.5 HSE Communication.....
A. Project HSE Committee......
B. Record of Meetings.
C. Reporting and Resolving HSE Issues..........
D. HSE Disciplinary Actions.......
E. Vehicles of HSE Communication.........
F. Toolbox Meetings.........
1.6 Contractor / Subcontractor Kick-Off Meetings.......
1.7 Safety Topic for Site Meetings...
1.8 Chemical Hazard Communication Program...
1.9 Project HSE Booklet....
1.10 Hazard / Risk Identification and Management........
A. Methods of Hazard Identification.............
B. Develop Solutions / Controls....
C. Systems Approach to Managing Hazards and Risks..........
D. Inspections.....
E. Job Risk Analysis (JRA)......
F. Safety Task Assignment (STA)...
G. Planning of Activities...
H. Risk Management and Assessment.
1.11 Occupational Health and Injury Management.......
A. Substance Abuse....
B. Employment Medical Examinations.......
1.12 Project Environmental Management and Indigenous Heritage........
A. Water Quality...........
B. Air Quality, including Dust, Emissions, and Odors.......
C. Noise and Vibration...
D. Waste Management..
E. Traffic Management..
F. Contaminated Land...
G. Public Relations and Liaison...
H. Wildlife Flora and Fauna and Natural Features......
I. Visual Intrusion, Signs, and Lighting..........
J. Archaeology.......
K. Worksite Housekeeping...
1.13 Emergency Response.........
1.14 Incident Investigation and Reporting...........
1.15 Performance Audit and Review.......
A. Planned Inspections..
B. Project Audits..
C. Reporting...
1.16 Maintenance, Inspection, Testing, and Modification.......
A. Rigging Equipment.......
1.17 Management of Change.
1.18 Site Access and Security..
1.19 Personal Protective Equipment (PPE)...................es and Mobile Equipment...
A. Light Vehicles.........
B. Heavy Vehicles and Mobile Equipment.......................
1.21 Overhead High Voltage (HV) Services...........
1.22 Buried Services.........
1.23 Working at Height.......
A. Scaffolding......
B. Ladders.......
C. Elevated Work Platforms (EWPs)......
1.24 Safe Work / Act Observation......
1.25 Working in Heat.........
1.26 Manual Handling..........
1.27 Critical Incident Management.........
1.28 Working Alone........
1.29 Floor Grating Removal...
1.30 Working on Roofs......
1.31 Cranes and Lifting Equipment.....
1.32 Respiratory Protection...
1.33 Traffic Management....
1.34 Loading, Transport, and Unloading Materials..
1.35 Fatigue Management...
1.36 HSE Hand Over.......
1.37 Pressurized Equipment......
1.38 Bulk Earthworks and Civil Works...................
1.39 Drill and Blast Operations.
1.40 Fibrous Materials.......
1.41 Railroad Safety..
1.42 Marine Operations.........
1.43 Concrete / Reinforcing Steel Work.............
1.44 Confined Space Entry......
1.45 Abrasive Blasting.........
1.46 First Line Breaks............
1.47 Tank and Piping System.....
1.48 Shop Equipment and Facilities.....
1.49 High Pressure Water Cleaning........
1.50 Lawn Equipment and Chain Saws......
1.51 Hot Tapping..........
1.52 Eating and Sanitation Facilities...
1.53 Powder Actuated Tools...
1.54 MIER......
1.55 Monthly Subcontractor Incident Summary Report.......
1.56 Radiation Control......
1.57 Lead Exposure........
1.58 Process Safety Management...
1.59 Pre Engineered Building Erection.........
1.60 Security...
2.0 COMMISSIONING HSE..
3.0 OPERATIONS AND MAINTENANCE HSE...........
3.1 Management Involvement........
3.2 Employee Involvement....
3.3 Employee Selection, Competency, and Training.......
3.4 Contractor Selection and Alignment........
3.5 HSE Communication...
A. HSE Committee......1
B. Record of Meetings.......
C. Reporting and Resolving HSE Issues.......
D. HSE Disciplinary Actions..
E. Vehicles of HSE Communication..
F. Toolbox Meetings....
3.6 Contractor / Subcontractor Kick-Off Meetings....
3.7 Safety Topic for Site Meetings..........
3.8 Chemical Hazard Communication Program.........
3.9 Site-HSE Booklet...........
3.10 Hazard / Risk Identification.....
A. Methods of Hazard Identification...
B. Develop Solutions / Controls.....
C. Systems Approach to Managing Hazards and Risks........
D. Inspections.......
E. Job Risk Analysis (JRA)....
F. Safety Task Assignment (STA)......
G. Planning of Activities....
H. Risk Management and Assessment.....
3.11 Occupational Health and Injury Management.......
A. Substance Abuse........
B. Project Medical Examinations..
3.12 Site Environmental Management and Indigenous Heritage......
A. Water Quality.....
B. Air Quality, Including Dust, Emissions, and Odors...
C. Noise and Vibration.......
D. Waste Management........
E. Traffic Management..
F. Contaminated Land......
G. Public Relations and Liaison..
H. Wildlife Flora and Fauna and Natural Features...
I. Visual Intrusion, Signs, and Lighting.............
J. Archaeology.....
K. Worksite Housekeeping....
3.13 Emergency Response.
3.14 Incident Investigation and Reporting.....
3.15 Performance Audit and Review.......
A. Planned Inspections..
B. Site Audits....
C. Reporting.......
3.16 Maintenance, Inspection, Testing, and Modification......
A. Rigging Equipment......
3.17 Management of Change..
3.18 Site Access and Security...................................................................................................................................... 57
3.19 Personal Protective Equipment (PPE)...........
3.20 Vehicles and Mobile Equipment......
A. Light Vehicles...........
B. Heavy Vehicles and Mobile Equipment.............
3.21 Overhead High Voltage (HV) Services.....
3.22 Buried Services..........
3.23 Working At Height........
A. Scaffolding.......
B. Ladders....
C. Elevated Work Platforms (EWPs)......
3.24 Safe Work / Act Observation......
3.25 Working in Heat.........
3.26 Manual Handling.........
3.27 Critical Incident Management.....
3.28 Working Alone......
3.29 Floor Grating Removal...
3.30 Working on Roofs.........
3.31 Cranes and Lifting Equipment....
3.32 Respiratory Protection.....
3.33 Traffic Management...
3.34 Loading, Transport, and Unloading Materials.....
3.35 Fatigue Management...
3.36 HSE Hand Over.........
3.37 Pressurized Equipment..
3.38 Bulk Earthworks and Civil Works........
3.39 Drill and Blast Operations.....
3.40 Fibrous Materials....
3.41 Railroad Safety........
3.42 Marine Operations...
3.43 Concrete / Reinforcing Steel Work..............
3.44 Confined Space Entry....
3.45 Abrasive Blasting.......
3.46 First Line Breaks......
3.47 Tank and Piping System...................................................................................................................................... 68
3.48 Shop Equipment and Facilities........
3.49 High Pressure Water Cleaning.......
3.50 Lawn Equipment and Chain Saws......
3.51 Hot Tapping......
3.52 Eating and Sanitation Facilities.......
3.53 Powder Actuated Tools...
3.54 MIER................
3.55 Monthly Subcontractor Incident Summary Report....................................................................................... 70
3.56 Radiation Control......
3.57 Lead Exposure...............
3.58 Process Safety Management........
3.59 Pre-Engineered Building Erection.............
3.60 Security.........
4.0 RESOURCES......
5.0 REFERENCES......... 71 |