Execution of Process Automation Systems (PAS) projects
Table of Contentsе
1 Scope............................................................. 2
2 Applicable Documents................................... 2
3 Definitions...................................................... 3
4 Instructions..................................................... 6
5 Responsibilities............................................ 12
6 Approval, Deviation and Exceptions............ 14
1 Scope
This B.V. Engineering Procedure (EP) defines the procedures and responsibilities for the execution of Process Automation Systems (PAS) projects with the exception of royalty custody metering facilities. EP-104 is applicable to all B.V. capital projects which include process automation systems, and where the overall cost of the PAS portion is at least $1,000,000. The cost shall include all direct B.V. costs to design, procure, install and commission the system.
In the event that some or all of the steps are executed by contractors or vendors, the project management team (PMT) shall ensure that the project is executed within the framework of this procedure.
2 Applicable Documents
B.V. Engineering Procedures:
Authorization for Expenditure
Project Execution Plan
Project Proposals
Royalty/Custody Metering Facilities Execution Guide
Third Party Royalty/Custody Metering Facilities Execution Guide
Engineering Study Program
Instructions for Obtaining a Waiver of a Mandatory B.V. Engineering Requirement
Engineering Reviews of Project Proposal and Detail Design Documentation
Capital & Non Capital Programs Planning
Preparation of Functional Specification Documents
Bid Slate Development
Preparation of Technical Bid Evaluation Plan
Preparation of System Design Document
Configuration and Graphics Guidelines
Integration Specifications Document
Integration Test Procedures
Factory Acceptance Test
Installation and Checkout Plan
Site Acceptance Test
Operating Instructions for PAS
Maintenance Instructions for PAS |