Installation and Checkout Plan
Table of Contents
1 Scope............................................................. 2
2 Conflicts and Deviations................................. 2
3 Applicable Documents.................................... 2
4 Responsibilities.............................................. 3
5 Instructions..................................................... 3
6 Definitions...................................................... 3
Appendix 1 - Required Contents
for the I&C Plan...............................
- Scope
The Installation and Checkout Plan (ICP) covered by this procedure shall be considered as one of the Non-Material Requirements (NMR) called for by EP-. The ICP document is not required to follow the format provided in this EP, but shall contain the information specified.
The ICP is a deliverable document prepared by the Contractor. The Plan shall specify in detail organizational responsibilities, resource requirements, schedules, and step-by- step procedures for the installation and checkout of the System in the job site.
The ICP will be used by the Contractor to guide and control the installation and checkout of the process automation system after its delivery to the plant site. |