TheICP will be used by the Contractor to guide and control the installation and checkout of the process automation system after its delivery to the plant site.
|
SAT Plan is a document which specifies and describes the conditions, requirements, plans, procedures, success criteria, and responsibilities for performance of the SAT.
|
This Engineering Procedure (EP) provides the requirements for the Maintenance Manual used with Process Automation Systems (PAS).
|
This Engineering Procedure (EP) provides the requirements for the Operating Instructions Manual used with Process Automation Systems (PAS).
|
This Engineering Procedure (EP) provides instructions for the development and approval of the process automation system (PAS) project Factory Acceptance Test (FAT) Plan. The FAT Plan shall contain the information specified in this EP. However, it is not required to follow the format provided.
|
This Engineering Procedure (EP) provides instructions for the development and approval of the Integration Test Procedure Document for all Integrated Process Automation Systems
|
This Engineering Procedure (EP) provides instructions for the development and approval of an Integration Specification Document (ISD) for all Integrated Process Automation System.
|
Configuration and Graphics Guidelines shall provide the design guidelines, standards, and implementation practices that are to be used for design of the PAS database configuration.
|
Any Process Automation System (PAS), Process Control Systems (PCS), Distributed Control Systems (DCS), Supervisory Control & Data Acquisition Systems (SCADA), combined DCS/SCADA, "Process Computers" and any combination of these items shall fall under the scope of this EP
|
Corporate Managementhas endorsed the concept that Project Proposals for individually engineered Budget Items (BIs) will be supported by Design Basis Scoping Papers (DBSPs).
|
|
|